Door installed

David’s future art studio has a new door. The race is on to get as much done as possible before the winter comes. The goal is to get all of the external upgrades completed as soon as possible.

The windows are next on the list. The electrical service is after that. Then the plumbing, interior wall placement, and insulation.

We will also be putting the gardens to bed and moving plants in the back yard to get ready for the deck installation.